11 hours done 14 hours left
So today me and my mentor worked on a sidejob he had and we set up two lighting inside of a garage. The lights we instaled had to have new cables run through it so we connected them first into the main fuse box inside the house. From there we run the wires to the lights and connected them. We had to drills some holes and I got to see how cables had to be connected into the main fuse box in your house. This took about 5 hours.
No comments:
Post a Comment